Hi,
It’s quite a long time that I haven’t write here. But the studio build had taken a step further this last months. I’ve have install the air conditioner system, almost all the electric cables and also multipair and cat6 cables. The live room has seen its insulation finished (no intern acoustic treatment yet, even if this around 50cm insulation will basstrap a lot). So there are few layers from the ouside: 50cm brics, space, 14cm concret 45 rockwooll (Knauf), 2 OSB, 1gyps, 1 roofing, 1 gyps. wouch!
The rest of goods for CR, booth and other (hall, lounge, airbooth,..) are up too. A LOT of Homatherm (also for basstrap and such) is ready to be cut!